Construction Work
Condominium B’s mainbuildingarchitectural work and plastering work is 100% finished. Floor 3-18 architectural work, ceiling work, and floor work is 100% finished. The swimming pool architectural work is 100% finished; the main equipments of M&E work have already been installed 100%, the installing of elevators is 100% finished, car park building structural work and painting work is 100% finished. The construction of townhouse in Lagoon 2&4, Zone 1 (L4 Plan 21-26), the structural work of 1st floor is 100% and the architectural work of 1st-2nd floor is 95% finished the system work is 90% finished. Zone 2 (L4 Plan 8-13), the structural work of roof floor is 100% finished, the system work is 80% and the architectural work is 75% finished. The zone 3 (L2 plan 8-11) of Lagoon 2 structural work is 100% finished and architectural work is 60% finished and the system work is 60% finished. The zone 4 (L4 plan 2-7) of Lagoon 4 structural work in 2nd floor is 100% finished, and architectural work in 1st floor is 80% finished, and the system work is 80% finished. The zone 5 (L2 plan 2-7) of Lagoon 2 structural work in 2nd floor is 100% finished and the architectural work is 80% finished. The zone 6 (L2 plan 12-13) of Lagoon 2 structural work is 100% finished and the architectural work is 80% finished. The zone 7 (L4 plan 21-26) of Lagoon 4 structural work in 3rd floor is 100% finished and the architectural work is 35% finished. The zone 8 (L2 plan 23-28) of Lagoon 2 structural work is 100% finished and the architectural work is 40% finished.